1. Introduction: An ambitious technological vision

Nepal is exploring an ambitious opportunity to position itself as a destination for artificial intelligence (AI) infrastructure. A proposal to develop AI-powered data centres in the Himalayan locations of Rolwaling Valley in Dolakha and Manang has attracted attention, with an estimated investment requirement of NPR 5,000 crore (NPR 50 billion).

The proposed vision is built around two geographical advantages: Nepal's hydropower potential and the naturally cooler climate of its Himalayan regions.

At first glance, the idea appears attractive. The global AI industry requires enormous computing capacity, and data centres are becoming essential infrastructure for artificial intelligence, cloud computing, financial services and digital economies.

However, an important question must be asked before celebrating this ambition:

Can Nepal support large-scale AI infrastructure without compromising its electricity security, water resources, agricultural communities and environmental sustainability?

This is not an argument against technological development. It is a question of whether the country is prepared to manage the resource demands of such infrastructure.

A data centre is not simply a building filled with computers. It is an industrial facility that requires continuous electricity, cooling infrastructure, water management, network connectivity and reliable backup systems.

The economic benefits must therefore be examined alongside the environmental and social costs.

2. The electricity question: Can Nepal guarantee a continuous power supply?

Electricity is the foundation of every data centre.

AI infrastructure is particularly energy-intensive because it may contain thousands of high-performance processors, GPUs, storage systems, networking equipment and cooling systems operating continuously.

Unlike many conventional businesses, AI data centres are designed to operate around the clock.

Nepal has expanded its hydropower generation capacity and has become an electricity exporter during periods of surplus production. However, electricity availability remains seasonal.

According to the World Bank's Nepal Country Economic Memorandum, Nepal's generation is strongly influenced by river flows. Run-of-river hydropower plants generally generate more electricity during the rainy season, while production decreases during the dry winter months.

Nepal consequently experiences a seasonal mismatch between electricity generation and demand.

The Kathmandu Post reported that Nepal recorded an electricity trade surplus of NPR 18.76 billion in fiscal year 2025/26. Nevertheless, the country continued importing electricity during dry months when hydropower production declined.

This distinction matters.

Being a net electricity exporter over an entire year does not mean Nepal has sufficient electricity available at every hour of the year.

A large AI data centre would introduce additional, relatively continuous electricity demand.

This raises several questions:

  • How many megawatts would the proposed facilities require?

  • What would their annual electricity consumption be?

  • Would their electricity supply remain secure during dry-season shortages?

  • Would they receive priority access to electricity during periods of domestic supply constraints?

  • Who would pay for additional transmission infrastructure?

  • Would the facilities purchase electricity through dedicated generation agreements or depend on the national grid?

These questions should be answered through an independent electricity-system assessment before investment approval.

Nepal's electricity priorities should not be overlooked

Nepal must continue strengthening its domestic electricity infrastructure.

Important priorities include:

  1. Reservoir-based hydropower development.

  2. Pumped-storage hydropower projects.

  3. Battery energy storage where technically and economically appropriate.

  4. Stronger transmission and distribution networks.

  5. Improved grid management and demand forecasting.

  6. Reliable electricity access for households, hospitals, schools, agriculture and domestic industries.

Pumped-storage hydropower is particularly relevant. It can use surplus electricity to pump water into an upper reservoir and release it later to generate electricity when demand increases.

However, storage is not a substitute for sufficient generation or transmission capacity. Nepal needs all three.

The government should establish how much electricity is available for new industrial loads after accounting for existing consumers, seasonal demand, reserve requirements and future domestic growth.

3. The water question: Who protects downstream communities?

Electricity is not the only resource required by data centres.

Cooling is another critical requirement.

AI processors generate significant heat during operation. Data centres must remove this heat to maintain safe operating temperatures and prevent equipment failure.

Depending on the design, cooling systems may use:

  • Evaporative cooling towers.

  • Water-based cooling systems.

  • Direct-to-chip liquid cooling.

  • Closed-loop cooling.

  • Air-based or dry cooling.

These systems have different water requirements.

It is important to understand that not every data centre consumes the same amount of water. Some systems circulate and reuse water, while evaporative cooling systems lose water through evaporation.

Therefore, the environmental impact depends on the cooling technology, facility size, climate, water source and operating conditions.

The Lawrence Berkeley National Laboratory's 2024 United States Data Center Energy Usage Report and subsequent research demonstrate why the energy and resource requirements of data centres need to be measured rather than assumed.

For Nepal, the concern becomes particularly important when considering facilities located in mountain watersheds.

The downstream agricultural risk

Consider a hypothetical situation.

A data centre is established near a Himalayan water source. Its cooling infrastructure withdraws water from a river or another local water supply.

During periods of sufficient water availability, the impact may be manageable.

But what happens during a dry season when river flows decline?

The same water system may support:

  • Drinking water for local households.

  • Irrigation for agricultural land.

  • Livestock.

  • Local businesses.

  • Aquatic ecosystems.

  • Downstream communities.

If industrial withdrawals are not carefully regulated, competing water demands could emerge.

This does not mean that the proposed projects will necessarily deprive farmers of water. That conclusion cannot be reached without knowing the exact sites, water sources, withdrawal volumes, seasonal river flows and return-water arrangements.

Nevertheless, the potential conflict is serious enough to require a detailed independent assessment.

A country's digital development should not come at the expense of the water security of its agricultural communities.

The government should require public disclosure of water withdrawal, actual consumption, seasonal requirements, wastewater management and downstream environmental impacts.

4. The Himalayan environment: Natural cooling does not mean zero environmental impact

The proposed Himalayan locations may offer cooler ambient temperatures, which could reduce some cooling requirements.

This is a potential technical advantage.

However, a naturally cold climate does not automatically make a data centre environmentally sustainable.

Construction and operation may require:

  • Roads and transport infrastructure.

  • High-capacity electricity transmission.

  • Fibre-optic connectivity.

  • Backup power systems.

  • Water supply and drainage.

  • Buildings and equipment transportation.

  • Waste management.

  • Emergency access and disaster-resilience systems.

Himalayan regions also require careful consideration of landslides, earthquakes, extreme weather, difficult access and fragile ecosystems.

The government should investigate whether the proposed locations can support the necessary infrastructure without creating unacceptable environmental or social impacts.

A project should not be described as green merely because it uses hydropower or is located in a cold geographical region.

Its full environmental footprint must be assessed.

5. Lessons from Europe: AI infrastructure also creates public-policy challenges

Nepal is not the first country to face questions about the growing electricity and water demands of data centres.

Several European governments have introduced policies to improve transparency, manage grid constraints and regulate data-centre development.

The European Union's Energy Efficiency Directive requires monitoring and reporting of energy-performance indicators for qualifying data centres.

The European Commission's reporting framework includes indicators relating to:

  • Total energy consumption.

  • Water consumption.

  • Renewable energy use.

  • Energy efficiency.

  • Waste heat reuse.

The EU has also established a common reporting framework under Delegated Regulation (EU) 2024/1364.

There are also examples of local restrictions.

Amsterdam introduced restrictions on new data-centre development and expansion until at least 2030. Ireland previously faced restrictions on new data-centre electricity connections around Dublin, with revised conditions introduced when the effective freeze ended in December 2025.

These examples demonstrate that attracting data-centre investment is not simply a matter of providing land and electricity.

Governments must consider the impact on existing electricity consumers, infrastructure capacity and environmental resources.

The lesson for Nepal is not that it should copy every European restriction.

Instead, Nepal should learn from the challenges other countries have experienced and establish clear resource-management regulations before large-scale development.

6. The economic question: Who actually benefits?

The proposed NPR 5,000 crore investment is an estimated investment requirement, not proof that the full amount has been secured or committed.

The project is described as being at a feasibility stage under a Public-Private Partnership approach. Its actual financial structure, investor commitments, public-sector obligations and commercial viability must be examined.

The government should publish answers to several questions:

  1. How many permanent jobs will the facilities create?

  2. How many temporary construction jobs will be generated?

  3. What percentage of contracts will go to Nepali companies?

  4. Will Nepali universities and research institutions receive access to computing infrastructure?

  5. Will local communities receive measurable economic benefits?

  6. What taxes and royalties will Nepal collect?

  7. Who will finance electricity transmission and water infrastructure?

  8. Who bears the financial risk if the project becomes commercially unviable?

There is another important consideration.

If Nepal provides land, infrastructure, electricity access and public incentives, the country should receive measurable public benefits in return.

The economic assessment should compare the proposed data-centre investment with alternative uses of the same resources, including domestic digital infrastructure, research facilities, local cloud services and industrial development.

7. What should Nepal do before approving the project?

Rather than rushing into construction or rejecting technological development without investigation, Nepal should establish a transparent approval framework.

The following conditions should be considered essential.

A. Independent electricity assessment

Publish the expected maximum power demand in megawatts, annual electricity consumption in megawatt-hours, seasonal requirements and grid impact.

The assessment should demonstrate how domestic electricity consumers will be protected.

B. Independent water-resource assessment

Identify the proposed water sources, estimate daily and annual withdrawals, measure actual consumption and examine dry-season availability.

The assessment must include downstream communities and agricultural requirements.

C. Environmental and social impact assessment

Conduct a comprehensive assessment covering biodiversity, mountain ecosystems, landslides, seismic risks, waste, construction impacts and local livelihoods.

D. Public disclosure and consultation

Publish feasibility findings and give local governments, farmers, affected communities, independent researchers and civil-society organisations an opportunity to participate.

E. Resource-consumption transparency

Require operators to publish annual information about:

  • Electricity consumption.

  • Peak electricity demand.

  • Water withdrawal and consumption.

  • Power Usage Effectiveness (PUE).

  • Water Usage Effectiveness (WUE).

  • Renewable electricity procurement.

  • Waste heat recovery.

  • Backup generator emissions.

F. Domestic electricity protection

Establish transparent rules for new industrial electricity connections and emergency demand management.

Essential public services and existing domestic electricity requirements must be protected.

G. Independent monitoring

Create a monitoring mechanism involving energy, water, environmental and local-government authorities.

Approval should be conditional on compliance with measurable resource-use limits.

8. Should Nepal pause the project?

Nepal does not need to reject AI infrastructure as a concept.

Artificial intelligence, cloud computing and digital services will play an increasingly important role in the global economy. Nepal should explore opportunities to develop its technology sector.

However, the country must distinguish between technological opportunity and responsible infrastructure development.

A temporary pause on final investment approval and construction commitments would allow the government to complete independent electricity, water, environmental and economic assessments.

If the proposed facilities can demonstrate reliable power arrangements, sustainable water use, environmental safeguards and measurable benefits for Nepal, the public can evaluate the project based on evidence.

If those conditions cannot be demonstrated, approval should not proceed.

The burden of proving sustainability should rest with the project developers and the approving authorities, not with farmers and local communities who may experience the consequences.

9. Conclusion: Development must begin with public interest

Nepal has significant hydropower potential, a naturally cool Himalayan climate and an opportunity to participate in the global AI economy.

But natural resources are not unlimited, and infrastructure investment is not automatically public development.

Electricity security, water availability, agricultural livelihoods and environmental protection are fundamental requirements for Nepal's long-term prosperity.

The government should first establish a reliable energy system, strengthen storage and transmission infrastructure, protect local water resources and ensure that existing citizens and industries are not disadvantaged.

Only then should it make decisions about allocating additional resources to large-scale AI infrastructure.

The question is not whether Nepal should embrace technology.

The question is whether Nepal can develop technology while protecting the people and natural resources that make development possible.

AI infrastructure should serve Nepal's development, not make Nepal's development serve AI infrastructure.


References and Further Reading

  1. World Bank – Nepal Country Economic Memorandum, 2025.
    https://www.worldbank.org/en/country/nepal

  2. The Kathmandu Post – Nepal records Rs18.76 billion electricity trade surplus in fiscal 2025-26, July 24, 2026.
    https://kathmandupost.com/money/2026/07/24/nepal-records-rs18-76-billion-electricity-trade-surplus-in-fiscal-2025-26

  3. Lawrence Berkeley National Laboratory – 2024 United States Data Center Energy Usage Report.
    https://eta.lbl.gov/publications/2024-lbnl-data-center-energy-usage-report

  4. European Commission – Energy Performance of Data Centres.
    https://energy.ec.europa.eu/topics/energy-efficiency/energy-efficiency-targets-directive-and-rules/energy-efficiency-directive/energy-performance-data-centres_en

  5. European Union – Commission Delegated Regulation (EU) 2024/1364.
    https://eur-lex.europa.eu/eli/reg_del/2024/1364/oj

  6. Reuters – Where authorities are restricting data centres amid AI boom, July 14, 2026.
    https://www.reuters.com/legal/litigation/where-authorities-are-restricting-data-centres-amid-ai-boom-2026-07-14/

Research note: The NPR 5,000 crore project figure and the proposed locations are presented as reported proposal details, not as independently confirmed funding or completed construction. Site-specific electricity demand, water requirements and downstream impacts have not been established in this article. They require official project documentation and independent assessments.

Comments

Post a Comment

Popular posts from this blog

The 2026 DataHub Nepal Infrastructure Breach & Financial Sector Fallback

PhantomSub Campaign:Malicious npm Packages Silently Hijack WhatsApp Accounts

Welcome to My Cybersecurity Research Blog